logo

The Cost of Poor Quality: Tools for Effective Control & Reduction

Knowledge Center

Six Sigma

Best Practices

Rating

Ajay Deshpande
14
Ajay Deshpande
Partner, India

The Cost of Poor Quality: Tools for Effective Control & Reduction

Which Six Sigma tools are effective to determine and reduce the cost of poor quality (in the manufacturing sector)?
Since there are lot of quality tools used in industries, selecting correct, effective tools would lead to reduce time of problem solving. Hence it is essential to identify appropriate tools.

X

Sign up for free

Welcome to the Six Sigma best practices of 12manage.

Here we exchange knowledge and experiences in the field of Six Sigma.

❗Sign up now to gain access to 12manage. Completely free.

Reg
 

Rating

  ARAVIND
3
ARAVIND
Project Manager, India
 

Tools Used for Arriving at Cost of Poor Quality (COPQ)

Failure Mode and Effects Analysis (FMEA) can be used to estimate the COPQ. In FMEA, we will arrive at the risk priority number (RPN). Based on this, it is possible to arrive at COPQ.
For further details plese refer the article published by Mr. Pankaj Sharma.

  MARIO ALVARADO
2
MARIO ALVARADO
Teacher, Costa Rica
 

Tools to Determine Cost of Poor Quality

(Translated by Editor)
To determine the cost structure, I recommend to initially use the CTQ Tree (Critical to Quality) from which you can derive "non-conformities" that can then be translated into costs of poor quality.
After having determined the structure of quality costs, the accounting department has a key role in measuring these costs. Their reports would form the basis for further analysis.
In reducing these costs I recommend starting with the use of Lean tools from the analysis of the molting process, as well as more advanced statistical tools including correlation analysis among others.

  Ajay Deshpande
2
Ajay Deshpande
Partner, India
 

Cost of Poor Quality

@ARAVIND: Good input. But in real time working, the challenge is correlation of risks to cost. My experience of FMEA application in the manufacturing industry is that it is not widely used for identification of risks that are associated with the cost of poor quality.
Although it is good idea that someone assign risks to cost related risks. Thanks.

  MARIO ALVARADO
2
MARIO ALVARADO
Teacher, Costa Rica
 

CTQ to Determine Cost of Poor Quality

(Translated by Editor)
The structure of the costs of poor quality can cover a lot of elements, however using the CTQ tree technique allows us to focus on KEY metrics of customer satisfaction.
The CTQ tree translates the client's initial requirements into numerical requirements for the product. These are the critical requirements that the organization should meet, and from where we should derive the parameters for determining the costs of poor quality.

  Jim Johnstone
2
Jim Johnstone
Consultant, United States
 

Cost of Poor Quality versus FMEA

@Ajay Deshpande: if you are using PFMEA (Process FMEA) as a prevention tool, perhaps you can adjust the severity ranking in the PFMEA analysis to focus on cost so that it is more tailored to what you want to accomplish.
If you already know where the costs are coming from, use the fault tree to go back upstream and find the root cause of the problems. Prioritize the problems by severity, frequency, and cost to correct (lower cost to correct is higher priority ranking number ) then compute your RPN and work from highest to lowest.

  Yingtao Zhang
2
Yingtao Zhang, China
 

Value Steam Mapping Tool

When you know the quality is poor, I think you had better to investigate where the poor quality is caused. For this value stream mapping can be adopted. With this tool, you can find where the poor quality is caused (defect, overproduction, waiting, non use of employees, transportation, inventory, movement, extra-processing).
Then you can focus on that issue to eliminate, reduce or reorganize it.

  Ger de Waard
2
Ger de Waard
Management Consultant, Netherlands
 

Tools Used for Arriving at Cost of Poor Quality (COPQ)

COPQ (annualized) = [Sum of (RPNi x ACRi) / Sum of (RPNi)] x Annual Reduction in Events

i = item (all the RPN's lines in your FMEA!)
RPN = Risk Priority Number
ACR = Average Cost to Resolve
Weighted Average Cost to Resolve (WACR) = (RPN x ACR) / RPN

If your Lean Six Sigma project team is struggling to calculate the COPQ and is approaching the end of the Measure phase, then it is advisable to use the FMEA approach to obtain this calculation using the RPN. This approach provides objectivity to the estimation of COPQ in particular when no measurements or initial data are available at the Define stage. Also as FMEA offers a structured approach, the above formula becomes easy to use. When capturing the dependence of any event’s cost on its severity, occurrence and detection (i.e. RPN), the determined COPQ will offer a closer estimate to the actual project benefit.
Example: Your lines in the FMEA calculates a total RPN of 1000. it also tells that the total Number of Events (the happenings) are 500 times that year and you want (in first instance) to reduce it by 400 times. (80% less)
Your ACR = $ 25000
This means your COPQ(ann) = ((1000 * $25,000)/1000) * (500-400) = $ 2,500,000.

 

Leave a comment
Help improve this subject


More on Six Sigma
Summary Discussion Topics
topic 3 Additional Six Sigma Levels
topic The Basis of Six Sigma? Statistics and Discipline
topic Implementing Six Sigma: Roles
topic Six Sigma in an R&D context
topic Six Sigma DMAIC and DMADV
topic Statistical Process Control (SPC): PPK versus CPK
topic The 5 x Why Method (The 5 Whys)
topic Focus of Six Sigma: The 6 Rights
topic Sustaining Momentum of Process Improvement over Time
topic Is Six Sigma Enough? (To Improve the Quality Level of an Organization...)
👀The Cost of Poor Quality: Tools for Effective Control & Reduction
topic Six Sigma for Marketing
topic Tools for Finding Root Cause in 6 Sigma
topic Add Standardization to DMAIC Phases in Six Sigma (DMAICS)
topic Evaluating Six Sigma Projects
topic Preparing Six Sigma: Requirements
topic Differences Between Six Sigma and TQM
topic Hypothesis Testing in DMAIC Projects
topic Six Sigma Effectiveness
topic Six Sigma in Medical Transcription
topic Disadvantages of Lean Six Sigma. Drawbacks
topic Evaluating Six Sigma Project Leaders
topic Best Practices Lean Six Sigma in Social Care
topic Quality Lessons in Dealing with Contractors
topic Six Sigma Manufacturing Example
topic Six Sigma for Retail
topic 6 Sigma Timeframe/Period
topic Six Sigma Black Belt Certification
topic Six Sigma In Inbound Call Center
topic Six Sigma in Passengers Handling
🔥 7 Key Principles of Six Sigma
topic Next Step after Voice Of Processes have been Defined?
topic Good Practitioner Books on Lean - Six Sigma, S&OP?
topic Organizational Development + Six Sigma or Lean
topic Should Six Sigma start after Lean Implementation?
topic Lean 6 Sigma in Laboratories
Special Interest Group


More on Six Sigma
Summary Discussion Topics
topic 3 Additional Six Sigma Levels
topic The Basis of Six Sigma? Statistics and Discipline
topic Implementing Six Sigma: Roles
topic Six Sigma in an R&D context
topic Six Sigma DMAIC and DMADV
topic Statistical Process Control (SPC): PPK versus CPK
topic The 5 x Why Method (The 5 Whys)
topic Focus of Six Sigma: The 6 Rights
topic Sustaining Momentum of Process Improvement over Time
topic Is Six Sigma Enough? (To Improve the Quality Level of an Organization...)
👀The Cost of Poor Quality: Tools for Effective Control & Reduction
topic Six Sigma for Marketing
topic Tools for Finding Root Cause in 6 Sigma
topic Add Standardization to DMAIC Phases in Six Sigma (DMAICS)
topic Evaluating Six Sigma Projects
topic Preparing Six Sigma: Requirements
topic Differences Between Six Sigma and TQM
topic Hypothesis Testing in DMAIC Projects
topic Six Sigma Effectiveness
topic Six Sigma in Medical Transcription
topic Disadvantages of Lean Six Sigma. Drawbacks
topic Evaluating Six Sigma Project Leaders
topic Best Practices Lean Six Sigma in Social Care
topic Quality Lessons in Dealing with Contractors
topic Six Sigma Manufacturing Example
topic Six Sigma for Retail
topic 6 Sigma Timeframe/Period
topic Six Sigma Black Belt Certification
topic Six Sigma In Inbound Call Center
topic Six Sigma in Passengers Handling
🔥 7 Key Principles of Six Sigma
topic Next Step after Voice Of Processes have been Defined?
topic Good Practitioner Books on Lean - Six Sigma, S&OP?
topic Organizational Development + Six Sigma or Lean
topic Should Six Sigma start after Lean Implementation?
topic Lean 6 Sigma in Laboratories
Special Interest Group
Knowledge Center

Six Sigma



About 12manage | Advertising | Link to us / Cite us | Privacy | Suggestions | Terms of Service
© 2024 12manage - The Executive Fast Track. V17.2 - Last updated: 17-5-2024. All names ™ of their owners.