Value Engineering (Miles and Erlicher)

Knowledge Center

Summary, forum, best practices, expert tips and information sources.

Contributed by: Mohamed A. Tantawy MBA AVS

21 items • 385.019 visits

ArabicChineseDutchFrenchGermanItalianJapaneseKoreanPortugueseRussianSpanishSwedish

X

Sign up for free

Welcome to the Value Engineering center of 12manage.

Here we exchange knowledge and experiences in the field of Value Engineering.

❗Sign up now to gain access to 12manage. It's completely free.

Reg
Summary

What is Value Engineering?

The Value Engineering method from Miles and Erlicher is a function-oriented, systematic team approach used to analyze and improve the value in a product, facility design, system or service. It is a powerful methodology for solving problems and/or reducing costs while improving performance/quality requirements. Value, as defined, is the ratio of Function to Cost, and can therefore be increased by either improving the function or by reducing the cost.


The terms Value Engineering (VE), Value Analysis (VA) and Value Management (VM) are used synonymously and interchangeably by some people. The approach is sometimes also referred to as Value Control, Value Improvement or Value Assurance.
 

Origin of Value Engineering. History

VE was developed in 1947 just after World War II at the General Electric Company when a shortage of material and labors affected GE production. Lawrence Miles was asked to explore why this occurred, and how cost reduction and performance improvement could be achieved.


Costs in Value Engineering

Note that when value engineers talk about reducing costs, they could be referring to either total life cycle costs or the direct costs of production. Total life cycle costs are the total expenditures over the whole life span of the product. This measure of cost is most applicable to expensive capital equipment, and includes manufacturing costs, installation costs, maintenance costs, and decommissioning costs. Individual expenditures must be discounted to reflect the time value of money. When referring to consumer products, the direct cost of production is more typically used. This measure is limited to the costs directly associated with manufacturing the product.


Usage of Value Engineering. Applications

Areas in which VE can be efficiently and profitably utilized are:

  • Engineering: Design, product improvement.
  • Manufacturing: Material Handling, tool design and production.
  • Purchasing: Manufacturer's vendor alternative proposals; new product information.
  • Sales: Slow selling products.
  • Systems and Procedures: Paperwork, forms processing, reproduction services.
  • Maintenance: Procedures, material, work scheduling.
  • Energy Conversion: Procedures, life cycle costing analysis.
  • Construction: planning, scheduling, labor, consumables. Surplus usage.

Steps in Value Engineering. Process

The common terminology offers a standardized step by step Job Plan of the systematic problem solving process and consists of four major phases:

  1. Information Phase. This phase involves defining of the problem to be solved, evaluating the feasibility of implementing the VE study for the problem, gather information about the problem, and allocate the required resources and team to execute the study.
  2. Speculative Phase. This phase aims to develop alternative approaches of providing the required functions at lower cost. The functional analysis is developed by the Function Analysis Systems Technique (FAST), which is a diagramming procedure that demonstrates the logical relations among the functions of building, system, or component.
    Upon creating the FAST diagram, the VE team shall start generating a wide variety of ideas. This helps to optimize the solution of a value improvement problem by increasing the probability of selecting the best idea through brainstorming or other idea generation techniques.
  3. Analytical Phase. The purpose of this phase is to apply cost comparisons and define the optimum alternative of those ideas generated in the previous phase. The Life Cycle Costing (LLC) is applied to study the lowest cost of the final selected alternatives.
  4. Proposal Phase. The purpose of this phase is to present results of the VE study to the stakeholders, to obtain approval from the client and to define concurrence and a commitment from the designer, project sponsor, and other management to proceed with implementation of the recommendation.

Value Engineering Process


Strengths of Value Engineering. Benefits

  • Optimizes Quality/Performance.
  • Reduces Total Life Cycle Costs of Projects or Processes.
  • Minimizes waste in Manufacturing and Design Process by eliminating wasteful practices.
  • Simplifies and Improves Functional Reliability and System’s Performance.
  • Identifies Potential Risks and Generates Solutions to Mitigate.

Limitations of Value Engineering. Disadvantages

  • VE should be performed as early as possible before commitment of funds. According to Pareto law 80% of the problem count represents 20% of the amounts to be paid. Therefore the optimum timing for VE study is during the design phase.
  • The approach depends on team work, creativity concepts.

Assumptions of Value Engineering. Conditions

Cost cutting alone is not the main function or objective. Neither is improvement alone.


Book: Miles, Laurence D - Technique in Value Analysis and Engineering

Book: Al-Yousefi, Abdulaziz - Value Management Concept & Techniques

Book: Stephen J. Kirk / Kent F. Spreckelmeyer - Enhancing Value in Design Decisions


Special Interest Group

Value Engineering Special Interest Group.


Special Interest Group
Special Interest Group (160 members)

Forum

Forum discussions about Value Engineering.


🔥 Concurrent Engineering
Working as part of an electrical design team for an expansion to the Alumina Refinery at Gladstone Queensland Australia I experienced first hand the utility of concurrent engineering. We keep forward ...
Rating4
 
Comments1 comments

Start a new topic

Start a new topic about Value Engineering

Courses

Courses about Value Engineering.


uifcode(333)

Beginners Course

uifcode(334)

Advanced Course

uifcode(335)

Course for Experts

Best Practices

The best, top-rated topics about Value Engineering. Here you will find the most valuable ideas and practical suggestions.


Expert Tips

Advanced insights about Value Engineering. Here you will find professional advices by experts.


uifcode(91)

Consultancy Tips

uifcode(92)

Teaching Tips

uifcode(93)

Practical Implementation Tips

Subject

Road Blocks of Creativity in Value Engineering

Value Engineering Creativity Phase (Speculative Phase)
The objective of the creative phase (or speculative phase) in a Value Engineering study is to develop large quantity of ...
Subject

Defining Functions in Value Engineering

Value Engineering Steps
Defining Functions is a crucial task when developing the FAST diagram and during implementing the information phase. A f...
Subject

Biographical Sketch

Lawrence Miles
Born: April 21, 1904 -- Harvard, Nebraska. Parents: Delos Daniel Miles, Superintendent of Harvard School, and Vinetta C...
Information Sources

Various sources of information regarding Value Engineering. Here you will find powerpoints, videos, news, etc. to use in your own lectures and workshops.


Presentation

Value Analysis: History, Methodology, Regulations and Certifications

Value Engineering, Value Analysis
Presentation about Value Analysis, including the following sections: 1. History of Value Analysis and the Concept of Va...
Presentation

Value Engineering Diagram

Value Engineering
Download and edit this 12manage PowerPoint graphic for limited personal, educational and business use. Republishing in ...
Presentation

Value Engineering Certificates

Certification Needs
VE Certificates Requirements as per SAVE International - http://www.value-eng.org/ ...

Tools

Useful tools regarding Value Engineering.


NWS

News

VID

Videos

PRS

Presentations

 
BKS

Books

ACA

Academic

WIK

More


Compare with Value Engineering: Brainstorming  |  Benchmarking  |  Value Stream Mapping  |  Business Process Reengineering  |  Earned Value Management  |  Managing for Value  |  Deming Cycle  |  Six Sigma


Return to Management Hub: Decision-making & Valuation  |  Program & Project Management  |  Supply Chain & Quality


More Management Methods, Models and Theory

Special Interest Group


About 12manage | Advertising | Link to us / Cite us | Privacy | Suggestions | Terms of Service
© 2024 12manage - The Executive Fast Track. V17.2 - Last updated: 19-5-2024. All names ™ of their owners.